Vertical Shaft Pump Control Valve
100,00 ₼
PRODUCT DESCRIPTION
Pumps are designed to automatically start and stop without damaging the system. It is connected to the system as a TE. The valve is open while the system is closed. From the moment the system is started, the valve closes itself slowly and ensures a smooth flow of water to the system. Valve control controller, time relay, switch, PLC control unit, etc. provided with control equipment.
Montage
When installing the valve, it must be flush with the pipeline.
Mount the valve on the line in the direction of the arrow shown on it.
When installing the valve in the line, isolation valves (sliding valve, butterfly valve, dirt trap, etc.) can be installed before and after the valve.
Close the solenoid valve [a] and the limit switch [d] according to the wiring diagram.
The valve should be mounted on the pipeline as a TE connection.
Technical Specifications
Network overpressure protection
Adjustable opening and closing speed
Low energy consumption
Easy maintenance
The ability to determine the position thanks to the limit switch on it
Adjustment
Connect the electrical panel of the pump control valve to the electrical panel of the pump according to the electrical diagram shown.
Open the “b1 and b2” ball valves.
The valve will open slowly. When the valve comes to the fully open position, fix the position of the Limit Switch indicated by “d” by adjusting it according to the position where the valve will be fully closed. The knob on the end of the valve’s indicator shaft should touch the Limit Switch.
Adjust the opening speed of the valve with the “e2” needle valve and the closing speed with the “e1” needle valve.
Maintenance
Check and clean the finger filter at the valve inlet according to the water quality. Do not clean the filter more than once every few months unless the water is very dirty.
Check line pressure periodically.
Address delivery
In the case of payment by bank transfer, we individually agree on a delivery date after receiving payment.
Our own fleet consists of 3, 9, 12 meter vehicles.
Delivery of goods in the city of Baku is carried out when ordering from 200 kg. To districts and neighboring cities when ordering from 1000 kg.
Delivery of goods within 1-2 working days after payment.
Our transport
Pickup from the warehouse
You can also pick up the goods from our warehouse in your own car.
Payment by bank transfer
For corporate clients, we accept payment by bank transfer. After placing the order, an invoice for payment will be generated, which you can pay according to the details sent to your email address. The funds will be credited to our account within 1-2 hours after the payment of the order.
Cash payment
If you want to buy goods for cash, it is better to call us by phone or write to the mail.
Thus, together we will quickly clarify all the nuances, cost and features of the product you are interested in.
Cash payment is made at the pickup point in our warehouse.
Upon receipt of the goods, be sure to check the completeness of the order and receipt.
Non-cash payment method (bank card)
You can buy goods by non-cash payment method (bank card) at the pickup point in our warehouse.