Horizontal Shaft Pump Control Valve

100,00 

+ -

PRODUCT DESCRIPTION
Pumps are designed to automatically start and stop without damaging the system. It is connected to the system in series. Opens with the pump. When the system is closed, first the valve is closed, then the pump. Prevents pressure fluctuations during opening and closing. It also acts as a hydraulic check valve. Valve control controller, time relay, switch, PLC control unit, etc. provided with control equipment.

Montage

When installing the valve, it must be flush with the pipeline.
Mount the valve on the line in the direction of the arrow shown on it.
When installing the valve in the line, isolation valves (sliding valve, butterfly valve, dirt trap, etc.) can be installed before and after the valve.
Close the solenoid valve [a] and the limit switch [g] according to the wiring diagram.

Technical Specifications

Easy care
Network overpressure protection
Low energy consumption
Active check valve
Adjustable opening and closing speed

Adjustment

Open the valves [h1,h2] shown on the valve.
Open the needle valve indicated by [d] 2 turns, the needle valve indicated by [c] 1 turn.
Loosen the nut on the indicator shaft with an Allen wrench.
Check the pump panel wiring diagram.
Start the pump while the ball valve at the valve outlet is closed. The pump control valve will fully open.
Press the stop button of the pump. The valve will close when the pump is running.
Mount the position nut on the level shaft and lower it until it touches the lever on the limit switch indicated by [g] (Do not lower further). The pump motor will stop. Fix the position by tightening the level nut on the shaft with an Allen key.
Start the pump again by opening the isolation valve at the outlet.
With the needle valve indicated by [c], you can adjust the opening speed of the valve.
When you stop the pump, you can adjust the valve closing speed with the needle valve indicated by [d].

Maintenance

Check and clean the finger filter at the valve inlet according to the water quality. Do not clean the filter more than once every few months unless the water is very dirty.
Check line pressure periodically.

 Address delivery

In the case of payment by bank transfer, we individually agree on a delivery date after receiving payment.
Our own fleet consists of 3, 9, 12 meter vehicles.
Delivery of goods in the city of Baku is carried out when ordering from 200 kg. To districts and neighboring cities when ordering from 1000 kg.
Delivery of goods within 1-2 working days after payment.

Our transport

 


 Pickup from the warehouse

You can also pick up the goods from our warehouse in your own car.

 Payment by bank transfer

For corporate clients, we accept payment by bank transfer. After placing the order, an invoice for payment will be generated, which you can pay according to the details sent to your email address. The funds will be credited to our account within 1-2 hours after the payment of the order.


 Cash payment

If you want to buy goods for cash, it is better to call us by phone or write to the mail.
Thus, together we will quickly clarify all the nuances, cost and features of the product you are interested in.
Cash payment is made at the pickup point in our warehouse.
Upon receipt of the goods, be sure to check the completeness of the order and receipt.


 Non-cash payment method (bank card)

You can buy goods by non-cash payment method (bank card) at the pickup point in our warehouse.

  • Home page
  • Close

    My Cart

    Great to see you here !

    A password will be sent to your email address.

    Already got an account?

    Close

    Categories