PRODUCT DESCRIPTION
BKV floater level control valves provide automatic water level control of tanks or reservoirs. Main valve control is provided by a 2-way pilot float. When the water level drops below the set level, the valve opens and starts filling the tank; when it reaches the set level, the valve closes and ensures that the water level remains stable. Float, plastic hose and plastic fittings are used in BKV Manual control valve.
Horizontal Float Level Control Valve
Montage
The valve can be installed in a vertical or horizontal position.
When installing the valve, it must be flush with the pipeline.
Mount the valve on the line in the direction of the arrow shown on it.
When installing the valve in the line, isolation valves (sliding valve, butterfly valve, dirt trap, etc.) can be installed before and after the valve.
Figure-1: In top-fed tanks, the valve is located above the water level. The floater can be mounted on the valve by means of a support.
Figure-2: The valve and floater are installed separately. Flater is placed on the warehouse wall.
Maintenance
Check and clean the finger filter at the valve inlet according to the water quality. Do not clean the filter more than once every few months unless the water is very dirty.
Check the floater position periodically.
Manual Operation
The valve can be closed manually by moving the ball valve marked [x] on the valve to the closed position.
Adjustment
Mount the float shown by [a] firmly according to the maximum water level in the tank.
Open the ball valve [x] shown on the valve.
Adjust the valve closing speed with the needle valve shown by [b].
TECHNICAL CHARACTERISTICS
Anma Çapları | DN 50 – DN 65 – DN 80 – DN 100 – DN 150 – DN 200 2” – 2½” – 3” – 4” – 6” – 8” |
Anma Basıncı | Orta Basınç Aralığı: ISO PN16 bar – 230 psi Yüksek Basınç Aralığı: ISO PN25 bar – 360 psi |
Çalışma Basıncı | Orta Basınç Aralığı : 0,7 – 16 bar / 10 psi – 230 psi Yüksek Basınç Aralığı : 0,7 – 25 bar / 10 psi – 360 psi |
Flanş Bağlantı Ölçüleri | TS ISO 7005/2 – EN 1092 – 2 |
Çalışma Sıcaklığı | -10 °C / 14 °F – 80 °C / 176 °F |
Test | Gövde Sızdırmazlık Testi : 1,5 X PN (TS EN 12266-1) Diyafram Sızdırmazlık Testi: 1,2 X PN (TS EN 12266-1) |
Kaplama | Kumlama + Fosforizasyon + Elektrostatik Toz Boya |
Hidrolik Bağlantı Elemanları | Dövme Pirinç – Galvaniz Kaplama Çelik |
Hidrolik İletim Borusu | Bakır Boru – Paslanmaz Çelik Boru – Alüminyum Boru |
Address delivery
In the case of payment by bank transfer, we individually agree on a delivery date after receiving payment.
Our own fleet consists of 3, 9, 12 meter vehicles.
Delivery of goods in the city of Baku is carried out when ordering from 200 kg. To districts and neighboring cities when ordering from 1000 kg.
Delivery of goods within 1-2 working days after payment.
Our transport
Pickup from the warehouse
You can also pick up the goods from our warehouse in your own car.
Payment by bank transfer
For corporate clients, we accept payment by bank transfer. After placing the order, an invoice for payment will be generated, which you can pay according to the details sent to your email address. The funds will be credited to our account within 1-2 hours after the payment of the order.
Cash payment
If you want to buy goods for cash, it is better to call us by phone or write to the mail.
Thus, together we will quickly clarify all the nuances, cost and features of the product you are interested in.
Cash payment is made at the pickup point in our warehouse.
Upon receipt of the goods, be sure to check the completeness of the order and receipt.
Non-cash payment method (bank card)
You can buy goods by non-cash payment method (bank card) at the pickup point in our warehouse.